🧱 Concreting in Ipswich
Compare 28 concreting operators across Ipswich. Driveways, paths, slabs and decorative concrete.
Plain driveway, per square metre: $95 – $165
Concrete work in SEQ covers everything from house slabs to decorative pours (exposed aggregate, stamped, polished). Pricing varies hugely by finish: a plain driveway and a polished-concrete slab look the same on quote until you read the line items.
Concreting operators in Ipswich
Verified operators ranked first. Listed entries are sourced from public records and may not yet be claimed by the operator.
Arock Construction Pty Ltd
Listed📍 Augustine Heights
BEC Concrete
ListedBelix Constructions
ListedBoral Concrete
Listed📍 Ipswich
Boral Concrete
ListedBoral Concrete
Listed📍 Ipswich
Chad's Epoxy Flooring Pty Ltd
Listed📍 Ripley
Cookies Concrete Pumping
ListedGrays Concrete Construction
ListedHard as concreting
ListedHardout Concreting
Listed📍 Springfield
Heidelberg Materials - Ipswich Concrete
ListedHines Flooring Solutions
ListedHolcim Raceview (Ready Mix)
ListedHy-tec Concrete & Aggregates Swanbank
ListedLTE Structures QLD
Listed📍 Bundamba
Mazzas Concrete
ListedNational Brick and Block
Listed📍 Ipswich
Nick Paterson Rendering
Listed📍 Ripley
Philipsen Construction
ListedPronto Mixed Concrete
ListedRaceview Sand & Gravel
ListedRiver City Concrete Constructions
Listed📍 Springfield
Sapar Landscaping Supplies Pty Ltd
ListedScotty Macs Concreting
ListedSmall Concrete Slabs - Ipswich Brisbane Logan
Listed📍 Brassall
The Haggarty Group Qld
Listed📍 West Ipswich
WAGNERS Concrete Wulkuraka
Listed📅 When to book
Plain pours 2-4 weeks. Decorative work (exposed aggregate, polished, stamped) needs 3-6 weeks for material lead-time. Avoid wet-season pours where possible.
📋 License & verification
Concrete work over $3,300 requires QBCC license. Structural slabs (homes, retaining) need engineer-certified design + QBCC builder, not just a concreter.
⚠️ Common mistakes
- •Skipping the moisture barrier on a slab — leads to rising damp years later
- •Ordering inadequate concrete strength for the application — N20 for footpath, N25 minimum for driveway, N32+ for structural
Frequently asked questions
How long before I can drive on a new driveway?
Foot traffic at 24 hours, light vehicles at 7 days, heavy trucks at 28 days when concrete reaches design strength. Don't park heavy vehicles or trailers on it before then.
What's the difference between exposed aggregate and stamped concrete?
Exposed aggregate reveals the stone within the mix — durable, slip-resistant, costs ~30% more than plain. Stamped concrete is texturally pressed to look like pavers or tiles — high upfront cost but no jointing maintenance.